Validity
- This quotation is valid for 14 days from the issue date, subject to a Tender Request payment of $1,500 to secure the price.
Site & Lot Assumptions
- This quotation is based on the selected build region and assumes the home will be sited on the minimum lot size for the selected design.
- Pricing assumes a level building platform with even cut and fill and a maximum slope of 500mm.
Vacant Land Requirement
- This quotation assumes the home will be constructed on a vacant block of land.
- Additional costs will apply for knockdown rebuilds in existing residential areas.
Tender Validity
- Pricing assumes construction will commence within 180 days of the Tender Request.
- An additional charge of $1,500 per month applies to extend the tender period.
- Please discuss extensions with your consultant when requesting the tender.
Service Connections
- This quotation assumes water, electricity, sewer, stormwater, gas, and telecommunications connections are located within 8 metres of the building boundary connection point.
- If services are beyond 8 metres, the client is responsible for all extension costs and associated fees before construction begins.
Stormwater Requirements
- This quotation assumes Council, Sydney Water, or other authorities will not require a stormwater detention or charge system.
- If required, additional costs may apply.
Structural Engineering
- A Structural Engineer’s report confirming the adequacy of the structure to support expected loads must be submitted for review and approval before construction begins.
Building Near Sewer Lines
- This quotation is subject to Sydney Water requirements when building adjacent to a sewer line.
- A sewer peg-out report may be required to determine the depth and location of the sewer in relation to the dwelling.
- Any additional works required to satisfy Sydney Water will be at the client’s expense.
Note:
- At this stage, because the sewer position and depth are unknown, no allowance has been made for Building Over Sewer (BOS) or Building Adjacent to Sewer (BAS) requirements unless otherwise stated.
- Until the sewer peg-out, piering, and slab design is completed by a qualified engineer, exact costs cannot be determined.
- Winton Homes’ standard concrete piering depth is up to 1500mm. Any additional piers, deeper piers, or slab strengthening required for BAS/BOS compliance will be charged as an additional cost to the client.
Additional Works
- Any items, inclusions, variations, or works not specified in this quotation or contract, if required by the owner or relevant authorities, will be charged as additional costs.
Soil Classification
- If the site is classified as Highly Reactive (H2), Extremely Reactive (E), or Problem Site (P), additional charges will apply in accordance with engineering requirements.
Additional Dwelling Types
- No allowance has been made for fees related to granny flats, dual occupancies, duplexes, or subdivisions.
- Any council or authority fees for these developments must be paid by the owner.
BASIX Assessment
- Standard BASIX requirements have been included in this quotation but are subject to final assessment.
- If additional energy efficiency requirements are identified, any associated costs will be the owner’s responsibility.
National Construction Code (NCC)
- At the time of this quotation, all inclusions comply with the current National Construction Code (NCC).
- If the NCC changes after the contract is signed, the builder is not responsible for additional compliance costs, and any required changes will be issued as a variation to this quotation.